Skip to content
Ipswich Plastering Call

Commercial · Dry Lining

Dry lining contractors in Ipswich and Suffolk

We take on dry lining packages for fit-outs, developments and refurbishments: partitions, linings, ceilings and finishing. We work to the specified systems and coordinate with your other trades so walls close up when you need them to.

Plasterboard fixed to the walls and ceiling of a room

When it’s the right choice

  • Office and retail fit-outs
  • Residential developments
  • Partition reconfiguration in existing buildings
  • Ceilings and bulkheads

Package scope

Metal stud partitions
Built to the specified system, including head details and deflection where required.
Wall linings
Dot and dab or framed linings to masonry.
Ceilings
Suspended and framed plasterboard ceilings and bulkheads.
Fire, acoustic and moisture boards
Installed as part of the specified system. Ratings depend on the complete system and installation, not the board alone.
Taping and jointing or skim
Finished to the agreed standard ready for decorators.
Plasterboard fixed to the walls and ceiling of a room
Plasterboarding
Timber stud partition with a doorway and partial plasterboard lining
Stud partitions
Plasterboard fixed beside adhesive dabs on a blockwork wall
Dot and dab
Mesh joint tape over a plasterboard seam beside a roll of tape
Joint taping
Plasterboard walls and ceiling with taped and jointed seams
Plasterboard taping

What the work involves

  1. 1

    Price from drawings

    Layouts, specification and partition schedules let us price accurately.

  2. 2

    Set out

    Partitions set out to drawings and checked with you before boarding.

  3. 3

    First fix coordination

    Services are installed before the second side is closed.

  4. 4

    Board and finish

    Boarded, finished and handed over area by area.

Want a price for your dry lining?

Send drawings, a specification or quantities.

Get a Quote

Things to know

Specified systems
Fire and acoustic performance depend on following the specified system. We’ll raise anything that isn’t clear on the drawings.
Programme
Close-up dates are agreed with the M&E trades.
What affects the price
Area and quantities, specification, access and working hours, programme and phasing, and how much of the work needs to be done around other trades.
Agree the fixing and finishing requirements
Tell us where cabinets, radiators, grab rails or heavy fittings will go before walls close up. Board support and reinforcement can then be planned. Fire and acoustic performance comes from the complete specified partition, including joints and penetrations, not a board label alone.

Questions about dry lining

Get in touch

Tell us about your job using the form, or call or email us. Photos, measurements or drawings help us give a more accurate price.

Quote for commercial dry lining

Tell us what you need. We’ll get in touch to discuss your project.

Is the work domestic or commercial?
Photos (optional)

Up to 5 photos. They help us give a more accurate price.

Free quote. No obligation.

We’ll only use your details to respond to your enquiry. See our privacy notice.

Call UsGet a Quote